The electrical and mechanical systems are now mostly roughed in. Lighting selections have been made and the building paper is on, We expect a green light to move forward on this inspection. Next up for the build is drywall, and the initial finishes.

Kitchen-LRoom-894x1024

(Above) View from kitchen. Notice the dividing wall between kitchen and dining room. We have decided to make a glass clerestory over the wall.

main_hall-601x1024

(Above) Another window opening above hallway entry.

exec-office-1024x761

(Above) Executive office. Fur-outs are framed and wired up for lighting.

back-1-1024x905

(Above) South wall in back of building. We have the tongue and groove soffit in place now. The change from cedar to pine will save a bundle on the project, but a stain will be used to match the exterior wood slat rain screen.

back-2-914x1024

(Above) South wall of tenant space. Wood soffit in place and looking good.
front-2-1024x735

(Above) Main Entry.
front-3-717x1024

(Above) Main Entry. Notice the old wall and it’s almost 7 foot eave height. What difference!

front-1-693x1024

(Above) Front of building. The finishes on the roof are really started to speak. Soffit still needs stain and seal to match future rain screen on facade.

front-4-1024x507

(Above) Overall front perspective.